Homewood Suites

Challenge

The owner of this income-property needed the building completed in time for an upcoming convention. Dietrich Building Systems had to deliver a structural solution that was a viable cost-effective alternative over the barjoist / concrete framing systems while:
·
Meeting all building code requirements of a non-combustible structure.
·
Expediting the project schedule to meet the critical timeline
·
Provide the owner with a high-end, superior quality floor system

Our Solution

Using cold-formed steel with our proprietary framing technology1
·
Framing crews could drive the project schedule, the end result of which was a faster completion of work.
·
Met requirement of a non-combustible structure
·
Structure is lightweight allowing for easy and quick maneuvering of framing components – further expediting the project schedule.
·
Off-site shop panel fabrication improved the quality of the finished wall panels and reduced the on-site labor construction costs.
·
TradeReady® Floor System – made for a solid, high quality flooring system that is friendly to the MEP sub-trades.

 

Project Data

Client Whiting Turner, Inc.
Architect Law / Kingdon, Inc.
Building Area 120,363 square feet
Location Melville, NY
Material Cold-Formed Steel Walls, Trusses and TradeReady® Floor System
Delivery Method Design-Build
Application 147 Unit Upscale Hotel

* TradeReady Floor System (U.S. Patent # 6,301,854, # 6,691,478, # 6,418,694, other Patents Pending)
To learn more about how Steel Frame Building Systems may assist you on your current or upcoming project, please contact Project Services at 678-382-0335

  4371 LaVista Road       Tucker,GA   30084       www.steelframehousing.org

Arena Crossing
Holiday Inn
Homewood Suites
Jefferson Block
Parkview Condominiums
Stonebridge IV
West Washington Apartments