Homewood Suites |
||
|
Challenge The owner of this income-property needed the building completed in time for an upcoming convention. Dietrich Building Systems had to deliver a structural solution that was a viable cost-effective alternative over the barjoist / concrete framing systems while: · Meeting all building code requirements of a non-combustible structure. · Expediting the project schedule to meet the critical timeline · Provide the owner with a high-end, superior quality floor system Our Solution Using cold-formed steel with our proprietary framing technology1 · Framing crews could drive the project schedule, the end result of which was a faster completion of work. · Met requirement of a non-combustible structure · Structure is lightweight allowing for easy and quick maneuvering of framing components – further expediting the project schedule. · Off-site shop panel fabrication improved the quality of the finished wall panels and reduced the on-site labor construction costs. · TradeReady® Floor System – made for a solid, high quality flooring system that is friendly to the MEP sub-trades. |
![]() |
|
|
|
Project Data Client Whiting Turner, Inc.Architect Law / Kingdon, Inc. Building Area 120,363 square feet Location Melville, NY Material Cold-Formed Steel Walls, Trusses and TradeReady® Floor System Delivery Method Design-Build Application 147 Unit Upscale Hotel * TradeReady Floor System (U.S. Patent # 6,301,854, #
6,691,478, # 6,418,694, other Patents Pending) 4371 LaVista Road Tucker,GA 30084 www.steelframehousing.org |
|
Arena Crossing
Holiday Inn
Homewood Suites
Jefferson Block
Parkview Condominiums
Stonebridge IV
West Washington Apartments