Jefferson Block

Challenge

Deliver a value-engineered design solution that would:
ˇ Accelerate the project schedule using single trade erection.
ˇ Meet the non-combustibility building codes using less mass.
ˇ Offer quality comparable / superior to traditional structural steel and concrete
The owner had previous experience with cold-formed steel construction, but was frustrated by the lack of support and expertise. A visit to one of our job sites helped the owner decide to convert his project to our building system.


Our Solution

By using our proprietary framing technology,1 TradeReadyŽ floor system, and cementitious floor underlayment we:

ˇ Enabled the framing crews to drive the project helping reduce the time to erect the structural frame.
ˇ Delivered a high quality solution with the TradeReadyŽ Floor System, eliminating the need for drop-ceilings and the associated costs.
ˇ Provided a strong but lightweight structure that substantially reduced the overall weight of the building, which in-turn helped reduce the associated engineering, labor, and material costs.

 

Project Data

Owner New Land Enterprises, LLP
Architect TDI Associates, Inc.
Building Area 179,000 square feet
Location Milwaukee, Wisconsin
Material Cold-Formed Steel, TradeReadyŽ Floor System
Delivery Method Design, Supply
Application Mixed Use Six-Story Retail/Condominium Complex

* TradeReady Floor System (U.S. Patent # 6,301,854, # 6,691,478, # 6,418,694, other Patents Pending)
To learn more about how Steel Frame Building Systems may assist you on your current or upcoming project, please contact Project Services at 678-382-0335
 

  4371 LaVista Road       Tucker,GA   30084       www.steelframehousing.org

Arena Crossing
Holiday Inn
Homewood Suites
Jefferson Block
Parkview Condominiums
Stonebridge IV
West Washington Apartments