|
Stonebridge IV |
||
|
Challenge Deliver 10 stories of mixed-use high-end apartment / condominiums above two stories of parking in an urban setting. · Building is unsymmetrical and irregular in shape, limiting the opportunity for traditional shear walls. · Design flexibility of the units was imperative – as the developer had varying and specific requirements. · Price and schedule could not be compromised. Our Solution With our proprietary framing technology1 and tested products, we delivered the unique requirements of this building. · Our building system achieved a more favorable building code classification – reclassified as Type IIA instead of a Type 1B. · General Stability package minimized story drift and helped achieve the challenging engineering requirements for the shear-walls. · Key in meeting the developer’s schedule, with our systems-oriented approach, the sub-trades began their work only one floor behind our framing crews. · Provided exterior sheathing as backing board on panels manufactured at our facility, using a thin brick exterior finish as an effective alternative to the traditional face brick and scaffolding savings advantage to the developer. |
![]() |
|
|
|
Project Data Owner Stonebridge Management & Development, Inc.Architect Berardi + Partners, Inc. Building Area 203,479 square feet Location Cleveland, OH Material Cold-Formed Steel, TradeReady® Floor System, Cementitious Underlayment Delivery Method Design-Build of Panelized Structural Frame and Building Envelope Application 200 Unit 12 Story Apartment / Condominium and Parking * TradeReady Floor System (U.S. Patent # 6,301,854, # 6,691,478, # 6,418,694, other Patents Pending) To learn more about how Steel Frame Building Systems may assist you on your current or upcoming project, please contact Project Services at 678-382-0335 4371 LaVista Road Tucker,GA 30084 www.steelframehousing.org |
|
Arena Crossing
Holiday Inn
Homewood Suites
Jefferson Block
Parkview Condominiums
Stonebridge IV
West Washington Apartments